Leaderboard · Rubika Liyaquat · infrastructure transport

infrastructure transport

Rubika Liyaquat · News Ki Pathshala — 3 of 528 claims, 1% of this anchor's coverage.

Share of coverage 1%

Who is held responsible

Framing of blame across the 3 claims in this topic
On infrastructure transport, blame points most at System & institutions 1 claims
System & institutions 1
No responsibility framing 2

Subtopics

Specific subjects within infrastructure transport, by claim count

All claims in this topic

3 claims, newest first
Claims Rubika Liyaquat made in infrastructure transport.
DateEpisodeClaimVerdictFraming
2026-07-02 News Ki Pathshala Live | Rubika Liyaquat | प्यासा पाकिस्तान, भारत को देने लगा परमाणु जंग की धमकी! India is advancing multiple hydropower projects on the Chenab in Jammu and Kashmir: the 1,000 MW Pakal Dul project, the approved Dulhasti Stage II project, the approved Sawalkot project (10,856 MW, ₹31,380 crore), and the cleared 850 MW Ratle project. Chenab hydropower projects not checked No responsibility framing
2026-07-02 News Ki Pathshala Live | Rubika Liyaquat | प्यासा पाकिस्तान, भारत को देने लगा परमाणु जंग की धमकी! A Chenab-Beas link tunnel project costing ₹2,352 crore has begun in Himachal Pradesh, with an 8-km tunnel to divert extra Chenab water to the Beas basin so India can store and use it. Chenab-Beas link tunnel not checked No responsibility framing
2026-07-02 News Ki Pathshala With Rubika Liyaquat: चढ़ावा चोरों पर बुलडोजर से चढ़ाई की तैयारी! | Ram Mandir India has no international container transshipment terminal, losing about Rs 1894 crore every year as cargo routes through Colombo or Singapore, while the sea depth at the Great Nicobar terminal site is 20 metres, suitable for large ships. transshipment terminal need not checked System & institutions