Pakistan's Tarbela dam has an installed capacity of 4,888 MW, representing 51-52% of WAPDA-affiliated hydropower capacity and about 30% of Pakistan's electricity needs as of 2012.

“यहाँ एक बांध है जिसे टारबेला बांध कहते हैं... आपकी स्थापित क्षमता 4,888 मेगावाट है... कुल क्षमता का 51 या 52% और 2012 तक पाकिस्तान की बिजली जरूरतों का लगभग 30%”
Arnab Goswami · The Debate with Arnab Goswami · factual pakistan security
▶ Watch source segment

Rationale

All three figures check out against WAPDA's own data and independent reporting: Tarbela's installed capacity is 4,888 MW (after the 2018 4th-extension added 1,410 MW to the earlier 3,478 MW), this equals roughly 51.6% of WAPDA-affiliated hydropower capacity (within the claimed 51-52%), and sources state the dam supplied about 30% of Pakistan's electricity needs as of 2012. The claim as broadcast accurately reflects these published figures.