← Rubika Liyaquat

accurate
confidence 80.0%
AI-assessed — pending human review

Claim

A Chenab-Beas link tunnel project costing ₹2,352 crore has begun in Himachal Pradesh; a 7-km tunnel will divert extra Chenab water to the Beas basin, and hydro projects — the 1,000 MW Pakal Dul, Dulhasti Stage II, the ₹31,380 crore Sawalkot project, and the 850 MW Ratle project — have been approved on the Chenab and Jhelum.

“हिमाचल प्रदेश में 2352 करोड़ की लागत से चिनाब व्यास लिंक टनल... परियोजना शुरू हो गई... 7 कि.मी. लंबी एक सुरंग चिनाब नदी में एक्स्ट्रा पानी को ब्यास बेसिन तक पहुंचा देगी।”
Rubika Liyaquat · News Ki Pathshala · factual pakistan security
▶ Watch source segment

Rationale

The core factual claims check out: the Centre approved a ~₹2,352 crore Chenab–Beas link tunnel in Himachal Pradesh (NHPC) to divert surplus Chenab water into the Beas basin, and the named hydro projects — 1,000 MW Pakal Dul, Dulhasti Stage II, the ₹31,380 crore Sawalkot (1,856 MW), and the 850 MW Ratle — are all real and approved/cleared on the Chenab. Two minor discrepancies keep it from being flawless: the tunnel is 8.7 km, not 7 km, and the project is approved and at the tender/DPR stage (a May 2026 tender was issued then cancelled) rather than construction having 'begun,' but these do not undermine the substance of the claim.

Evidence